Azure Backup: Vaulted PostgreSQL Flexible Server Backup Stuck InProgress After Failed 7-Day Backup with InternalServerError

ZlatkoLovcevic-0292 0 Reputation points
2026-11-19T15:52:21.3233333+00:00

Problem description

I am experiencing an issue where the backup for my Azure Database for PostgreSQL Flexible Server in the UK South region is stuck in the 'InProgress' state. Previously, a scheduled 7-day backup started on November 6, 2026, and ran for about seven days before failing with an 'InternalServerError'. The subsequent backup job, initiated on November 13, 2026, remains stuck in the 'Trigger Backup' / 'InProgress' state. The server is currently shown as 'Ready', and the server's health, high availability, and storage usage appear normal. I have verified that the backup vault and backup instance have the appropriate roles assigned, and I have confirmed that recovery points are available up to May 29, 2026. No recent configuration changes or failovers have occurred around the time the issue started. I am seeking guidance on how to resolve this stuck backup job and whether any backend operations can be cleared without affecting existing recovery points.

Environment

Azure Backup vault protecting an Azure Database for PostgreSQL Flexible Server in UK South; workload is production; protection objects include one vault and one backup instance; server state is 'Ready'.

What I've already tried

I have verified the server health, HA status, storage usage, and backup roles. I checked the activity logs and confirmed no configuration changes, restarts, failovers, or scale operations occurred around the time the backup started failing. I also confirmed that recovery points up to May 29, 2026, are available and that the server and backup roles are correctly assigned. Additionally, I have not manually triggered any on-demand backups since the job is already stuck.

Current status

I am seeking assistance to investigate the backend operation associated with the failed backup on November 6 and the currently stuck job from November 13. Specifically, I want to know if the stuck backup process can be cleared without deleting the backup instance or impacting existing recovery points, and how to proceed with resolving the stuck job to ensure backups resume normally.

Azure Backup
Azure Backup

An Azure backup service that provides built-in management at scale.

0 comments No comments

1 answer

Sort by: Newest
  1. Walker Pollitt 480 Reputation points
    2026-11-22T11:25:30.66+00:00

    Zlatko, keep the backup instance and its existing recovery points in place. I couldn’t verify a supported customer operation that clears this specific stuck PostgreSQL vaulted job while guaranteeing preservation of the points. In the Backup vault’s job details, collect the job IDs and UTC timestamps for both the November 6 InternalServerError and the November 13 job. Ask Azure Backup support to correlate them and confirm whether it can release the active operation on this instance while preserving retention.

    The May 29 date deserves a separate check now. Record the newest recovery point actually visible in the vault, then check the flexible server’s native point-in-time restore window. Those are separate recovery mechanisms. The server showing Ready doesn’t establish that November vaulted backups succeeded. Reporting both dates tells the incident owner what recovery coverage is currently available.

    PostgreSQL vaulted backups · Native PostgreSQL backup and restore

    Drafted with ChatGPT. Learning path · Monitor and back up Azure resources

    Was this answer helpful?

    0 comments No comments

Your answer

Answers can be marked as 'Accepted' by the question author and 'Recommended' by moderators, which helps users know the answer solved the author's problem.